|
PRODUCTION CONTROL
YIELD AND PRODUCTION TIPS FOR ROUGH MILL OPERATIONS - Topics covered include coping
with "Just-In-Time" scheduling in the rough mill; impact of cutting more lengths
on computerized cut-off saws; and improving yield and productivity by using thin kerf
saws.
(32 min.) Video In English Only. Order R27E. $115.00
VIDEO MAGAZINE SERIES 2, ISSUE 1 - THE TECHNOLOGY UPDATE SERIES FOR THE WOOD PRODUCTS
INDUSTRY
"Just-in-time" manufacturing
Finger jointing system at American Drew Furniture Co.
Computerized lumber tally system
Disposable insert tooling
(39 Min.) English Only. Order Video W1. $79.95
VIDEO MAGAZINE SERIES 2, ISSUE 3 - THE TECHNOLOGY UPDATE SERIES FOR THE WOOD PRODUCTS
INDUSTRY
Century Furniture Company's strategy for cost saving and automation. View Century's:
C.N.C tenon machine
Copy lathes
European style tenoner
Just-in-time flexible manufacturing systems
Chair packing
A high speed lumber stacking operation
(56 MIN.) English Only. Order Video W3. $79.95
EFFICIENCY IN WOODWORKING - Lectures 11. & 12. PRODUCT ENGINEERING (115 MIN.) Order
Videos
(2 Videos in Set), E11. $129.00
- The complete procedure: designs, bills of materials, route sheets, etc.
EFFICIENCY IN WOODWORKING - Lecture 18. PRODUCTION CONTROL (59 min.) Order Video E18.
$69.95
- Review of scheduling and control procedures commonly used in the wood industry
VIDEO MAGAZINE SERIES 3, ISSUE 6. - WOOD INDUSTRY VIDEO JOURNAL
FEATURES
Vacutherm, Inc. - vacuum drying systems
Forester Manufacturing Company
Speed lathes
Button lathe
Italian lathe
INTERESTING IDEAS
A log tagging (identification) system
Use of a lubricant in a lumber slicing operation
A car shower (washing) system at a woodworking plant
Sizing saw used at a glue reel
FEATURE
Computer controls for dry kilns
Dollco
Hildebrand
English only. Order VIDEO J6. $79.95
[ Home | Subject Search
| Full Listing | Order Form ]
|